Submission Number: 27622
Submission ID: 114286
Submission UUID: ce30c966-4999-47da-bfa4-8ef845a8aa7a

Created: Wed, 01/22/2025 - 16:06
Completed: Wed, 01/22/2025 - 16:06
Changed: Thu, 01/23/2025 - 15:18

Remote IP address: (unknown)
Submitted by: vicki.allen
Language: English

Is draft: No

Locked: Yes
Pollution Control Agency
Braun Intertec
242800
Rock Creek Motor Stop
AI 131365 / PRO20240001
Braun Intertec will conduct expanded water well survey and sampling of up to five properties within 1000 ft of the site. Braun Interc will oversee installation of soil borings and conduct sampling of groundwater and soil from these borings, conduct second seasonal soil vapor sampling of the sub-slab. Braun Intertec will select subcontractors by following the MPCA Purchasing Manual. Prior to the conclusion of the fiscal year, Braun Intertec will produce a Summary Report which will include all work and observations.
Project Duration
Fri, 01/19/2024 - 00:00
Sun, 06/30/2024 - 00:00
Sun, 06/30/2024 - 00:00
Yes
{Empty}
Contract Amounts
$27280.94
{Empty}
$27280.94
Yes
state
No
{Empty}
Lad Strzok
ladislaus.strzok@state.mn.us
satisfied
satisfied
satisfied
satisfied
Yes
{Empty}
4 - satisfied