Transportation Department
Sambatek, LLC fka Sambatek, Inc.
201794
Preliminary Design for State Project (SP) 3403-78
1035062W04
District needed a consultant to evaluate a previously completed study on TH 12 through the City of Willmar. The traffic study completed by the consultant confirmed a road diet would be a suitable solution for this project. Once we had the ADA walk through it was determined a full reconstruct of ADA was need.
Project Duration
Wed, 10/06/2021 - 00:00
Fri, 06/30/2023 - 00:00
Tue, 01/14/2025 - 00:00
Yes
{Empty}
Contract Amounts
$422083.81
$188274.85
$610358.66
Yes
state funds
No
{Empty}
DeSchepper,Phillip A
Phillip.DeSchepper@state.mn.us
It met expectations until the end, when project scope changed and ran out of time on the contract which was partially MnDOT fault as reviewed options or preservation or reconstruct.
I thought their work met expectations. Project changed from cpr and mill and overlay to reconstruct ADA which led to narrowing existing corridor and storm. This project had moving parts that I felt like the team adapted to well.
Fair for what was asked from them.
good
Yes
{Empty}
4 - satisfied