TRANSPORTATION DEPT
Short Elliott Hendrickson, Inc.
B26288
Phase I ESA and Drilling Investigation
{Empty}
To complete a Phase I ESA and Drilling Investigation. This work involves the investigation of current and proposed highway right of way that is known or suspected to be contaminated. The intent of this work is to identify possible sources of contamination that could impact soil and groundwater in the project corridor and to determine the magnitude and extent of contaminated soil and groundwater in the project corridor. This work enables MnDOT to identify contamination problems early in project development thus reducing potential liability and avoiding construction delays
Project Duration
Wed, 03/25/2009 - 00:00
Thu, 09/30/2010 - 00:00
Thu, 06/30/2011 - 00:00
Yes
{Empty}
Contract Amounts
$398615.31
$197310.04
$595925.35
Yes
Trunk Highway
No
{Empty}
Keri Aufdencamp
keri.aufdencamp@state.mn.us
Acceptable
Typos throughout the report; corrected after brought to their attention
Reasonable
Acceptable
Yes
{Empty}
4 - satisfied