Submission Number: 12972
Submission ID: 63436
Submission UUID: 4153d2e4-de69-4cb3-9937-2ca565869b42

Created: Thu, 01/19/2023 - 18:10
Completed: Thu, 01/19/2023 - 18:10
Changed: Thu, 02/09/2023 - 14:49

Remote IP address: (unknown)
Submitted by: admin
Language: English

Is draft: No
Current page: webform_submission_import

Locked: Yes
Human Services Dept
Industrial Hygiene Services Corporation
55SR0020
Abate Haz Mat in Shantz Hall - Ph 1B
{Empty}
Abate asbestos containing materias in preparation for Upgrade Shantz Hall construction project.
Project Duration
Fri, 01/27/2012 - 00:00
Tue, 03/13/2012 - 00:00
Tue, 03/13/2012 - 00:00
Yes
{Empty}
Contract Amounts
$3400.00
$-0.62
$3399.38
Yes
'08 AP
Yes
Contract within limits of single source, and predetermined facility allocation per distribution of master roster abatement designers.
Glen Heino
glen.heino@state.mn.us

Satisfactory – The Consultant performed in an average manner that demonstrated an acceptable understanding of the owner’s requirements and contract requirements. The consultant’s overall performance is equal to any negative performance. The Consultant has contributed to the success of the project.

Satisfactory – The Consultant performed in an average manner that demonstrated an acceptable understanding of the owner’s requirements and contract requirements. The consultant’s overall performance is equal to any negative performance. The Consultant has contributed to the success of the project.

Satisfactory – The Consultant performed in an average manner that demonstrated an acceptable understanding of the owner’s requirements and contract requirements. The consultant’s overall performance is equal to any negative performance. The Consultant has contributed to the success of the project.

Satisfactory – The Consultant performed in an average manner that demonstrated an acceptable understanding of the owner’s requirements and contract requirements. The consultant’s overall performance is equal to any negative performance. The Consultant has contributed to the success of the project.
Yes
n/a
5 - very satisfied