Submission Number: 12978
Submission ID: 63442
Submission UUID: 9f469210-df57-40e6-91f7-e48608ca3380

Created: Thu, 01/19/2023 - 18:10
Completed: Thu, 01/19/2023 - 18:10
Changed: Thu, 02/09/2023 - 14:49

Remote IP address: (unknown)
Submitted by: admin
Language: English

Is draft: No
Current page: webform_submission_import

Locked: Yes
Faribault Academies
Environmental Management Associates, Inc.
24906 (441623 MAPS)
Design of Asbestos Abatement Water Line Insulation
44DA0010
Design for abatement of asbestos-containing insulation on water pipe needing replacement at Mott Hall on the MSAD campus
Project Duration
Thu, 10/20/2011 - 00:00
Sun, 03/18/2012 - 00:00
Sun, 03/18/2012 - 00:00
Yes
{Empty}
Contract Amounts
$400.00
$0.00
$400.00
Yes
'08 AP
Yes
From master contract list of preferred vendors assigned to this project site
Glen Heino
glen.heino@state.mn.us

Satisfactory – The Consultant performed in an average manner that demonstrated an acceptable understanding of the owner’s requirements and contract requirements. The consultant’s overall performance is equal to any negative performance. The Consultant has contributed to the success of the project.

Satisfactory – The Consultant performed in an average manner that demonstrated an acceptable understanding of the owner’s requirements and contract requirements. The consultant’s overall performance is equal to any negative performance. The Consultant has contributed to the success of the project.

Satisfactory – The Consultant performed in an average manner that demonstrated an acceptable understanding of the owner’s requirements and contract requirements. The consultant’s overall performance is equal to any negative performance. The Consultant has contributed to the success of the project.

Satisfactory – The Consultant performed in an average manner that demonstrated an acceptable understanding of the owner’s requirements and contract requirements. The consultant’s overall performance is equal to any negative performance. The Consultant has contributed to the success of the project.
Yes
n/a
5 - very satisfied