TRANSPORTATION DEPT
URS Corporation
B41738
Phase II Environmental Site Assessment
{Empty}
MnDOT was evaluating alternatives for the reconstruction of a portion of TH 52 between 327th Street and TH 19 in Cannon Falls, MN. The preferred alternative entails: replacement of signalized intersections at TH 52/North CSAH 24 and TH 52/South CSAH 24 with a new TH 52 mainline overpass and a diamond interchange, respectively; termination of street level TH 52 access at various points along the Project Corridor; and construction of east and west frontage roads north and south of the TH 52/South CSAH 24 diamond interchange. The preferred alternative includes acquisition of new right-of-way. The intent of this contract was to identify to the extent possible any sources of contamination that could impact the project corridor, and to complete a drilling investigation of any suspect areas to identify the presence, magnitude and extent of contaminated soil and/or groundwater in the project corridor. The information obtained by this drilling investigation will be used by MnDOT to assess the feasibility of the preferred alternative and develop final project design plans and specifications.
Project Duration
Thu, 04/15/2010 - 00:00
Mon, 01/31/2011 - 00:00
Mon, 01/31/2011 - 00:00
Yes
{Empty}
Contract Amounts
$66282.00
{Empty}
$66282.00
Yes
Trunk Highway
No
{Empty}
David Liverseed
david.liverseed@state.mn.us
above average
above average
reasonable
above average
Yes
{Empty}
4 - satisfied