TRANSPORTATION DEPT
SRF Consulting Group, Inc.
A96965
Crosstown Commons Construction Design Support
89676
The purpose of this Contract was to provide on-call, as-needed design support for construction: clarification and/or verification of existing design plan; alternative design for changes due to field discovery; design, details, calculations, quantities for design changes or field revisions. MnDOT needed the original designer to be available for plan changes during construction.
Project Duration
Wed, 12/20/2006 - 00:00
Sat, 07/31/2010 - 00:00
Thu, 06/30/2011 - 00:00
Yes
4775
Contract Amounts
$499622.20
{Empty}
$499622.20
Yes
Trunk Highway
Yes
This was a complicated construction project with a high potential for field revision needs. MnDOT was obligated for up to $25,000 per day for any construction delays caused by MnDOT. To reduce the risk of those delays, MnDOT requested to contract with the original designer to address the potential need for field revisions.
Steven Barrett
steven.barrett@state.mn.us
good
good
good
VERY good
Yes
{Empty}
5 - very satisfied