TRANSPORTATION DEPT
Peer Engineering, Inc.
B47507; 36585
Phase I ESA Update & Drilling Investigation
{Empty}
State plans to reconstruct approximately 1.1 miles of TH 9 from the northwest end of Bridge 6694 over Marsh River to approximately 0.2 miles north of Ada city limits. The proposed construction of TH 9 includes bridge replacement (Bridge 8865), grading, concrete pavement, and utility replacements. The project currently does not include the purchase of new right-of-way. A Phase I Environmental Site Assessment (Phase I) and Drilling Investigation was completed in 2001. The purpose of this Contract is to complete a limited Phase I Environmental Site Assessment Update (Phase I Update) and Drilling Investigation (Phase II) based on suspected areas of contamination identified during the previous Phase I. This information will be used by State to determine final project design plans and specifications, and to obtain liability protections.
Project Duration
Thu, 08/12/2010 - 00:00
Sun, 07/31/2011 - 00:00
Fri, 03/02/2012 - 00:00
Yes
{Empty}
Contract Amounts
$95921.00
$0.00
$95921.00
Yes
Trunk Highway
No
{Empty}
Keri Aufdencamp
keri.aufdencamp@state.mn.us
great
acceptable
reasonable
very good
Yes
{Empty}
5 - very satisfied