TRANSPORTATION DEPT
Short Elliot Hendrickson (SEH), Inc.
A91455
US 14 EIS from Owatonna to Dodge Center
89430
The State contracted with SEH, Inc. to provide professional, technical services for preliminary design for a four-lane divided, full access controlled freeway segment of US Highway 14 (US 14) from Owatonna to Dodge Center. The Contractor provided preliminary design work that included Planning, Environmental Impact Statement (EIS), Final Geometric Layout, Construction Limits, Official Mapping of the project area, and acquiring Municipal Consent.
Project Duration
Fri, 07/14/2006 - 00:00
Tue, 09/01/2009 - 00:00
Thu, 07/14/2011 - 00:00
No
{Empty}
Contract Amounts
$899964.00
$330534.61
$1230498.61
No
TH
No
{Empty}
Heather Lukes
heather.lukes@state.mn.us
The Contractor managed the original time budgeted and the time extensions for this Contract above average. The time delay for the final deliverables was determined by the State as necessary to resolve all the project issues that evolved during the project development process.
Contractor provided high-quality deliverables on an average level
The Contractor managed the budget estimate on an average level. All the cost increases were the results of additional work required by the State.
Overall, the Contractor performed very well between average and above average standards under this Contract. They adapted well to the changing nature of the project development process and delivered high-quality products.
Yes
{Empty}
5 - very satisfied