TRANSPORTATION DEPT
Stantec Consulting Services Inc.
B28353
Feasibility Study for Roundabout
94398
The State contracted with Stantec Consulting Services Inc. to provide professional, technical assistance to conduct a feasibility study for roundabout at three intersections, respectively: (1) TH 63 and TH 75th Street North in Rochester, (2) TH 57 and 16th Street North in Kasson and (3) TH 56/TH 60 in Kenyon The Contractor performed a highway capacity analysis and compared the operation, safety, and cost of a through-stop, all-way stop, signal, and roundabout at each intersection. The Contractor prepared a preliminary layout that met all Federal and State requirements for roundabout design. After discussing with section leaders the work to be completed, it was determined that there was no State employee with the required expertise available to complete this work.
Project Duration
Wed, 05/20/2009 - 00:00
Sat, 04/30/2011 - 00:00
Sat, 04/30/2011 - 00:00
Yes
{Empty}
Contract Amounts
$40007.00
$16230.00
$56237.00
Yes
TH
No
{Empty}
Chad Hanson
chad.hanson@state.mn.us
The Contractor’s management of time was above average.
The Contractor’s quality of work was average.
Cost management was above average. The cost increase was determined by State as necessary for the additional work identified.
Overall, the Contractor performed above average on this project.
Yes
{Empty}
4 - satisfied