Submission Number: 13290
Submission ID: 63754
Submission UUID: bb641970-f260-4db7-9f50-adaf2d0a2e6d

Created: Thu, 01/19/2023 - 18:10
Completed: Thu, 01/19/2023 - 18:10
Changed: Thu, 02/09/2023 - 14:49

Remote IP address: (unknown)
Submitted by: admin
Language: English

Is draft: No
Current page: webform_submission_import

Locked: Yes
TRANSPORTATION DEPT
Terracon Consultants, Inc.
3000011959
: Expert GPR Analysis TH 7 Concrete Pavement
99011
State is in need of two foundation borings in the Mississippi River to supplement the existing bridge borings for the new Dresbach Bridge.
Project Duration
Thu, 09/22/2011 - 00:00
Sat, 12/31/2011 - 00:00
Sat, 10/29/2011 - 00:00
Yes
{Empty}
Contract Amounts
$62739.70
{Empty}
$31830.85
Yes
TH
Yes
Agency determined that contractor was an objective expert able to evaluate roadway condition.
Rich Lamb
Rich.lamb@state.mn.us
Work was performed in a timely manner.
Quality of the work was above average.
Cost was within budget.
Overall, Terracon did an admirable job.
Yes
{Empty}
4 - satisfied