TRANSPORTATION DEPT
Stantec Consulting Services Inc. (formerly known a
3000019639
Design of Approaches for Replacing Bridge No. 6773
95660
The State contracted with Stantec Consulting Services Inc. to provide professional, technical assistance to complete preliminary and detail design of approach roadways for the replacement of Bridge No. 6773 on U S Highway 61 over Gilbert Creek in Lake City, Minnesota. This design work was in conjunction with the larger project by the State’s Bridge Office in Oakdale to replace Bridge No. 6773. The Contractor completed, among other deliverables, categorical exclusion document, design memorandum, geometric layout, preliminary and detail design for the approach roadways and traffic control plan. After discussing with section leaders the work to be completed, it was determined that there was no State employee with the required expertise available to complete this work.
Project Duration
Fri, 12/18/2009 - 00:00
Tue, 11/01/2011 - 00:00
Tue, 11/01/2011 - 00:00
Yes
{Empty}
Contract Amounts
$147021.65
$23287.79
$170309.44
Yes
Trunk Highway,
No
{Empty}
Heather Lukes
Heather.lukes@state.mn.us
Delivered on contract items on time.
Plans and documents met MnDOT standards.
Contractor billed for work completed after the Contract had expired.
The Contractor’s performance on this project was average.
Yes
{Empty}
4 - satisfied