TRANSPORTATION DEPT
University of Minnesota
3000023899
Validation of Prestressed Concrete I-Beam Deflecti
89261W200
Recent changes by suppliers in the consistency of Portland cement have decreased the accuracy of older design equations for prestressed concrete bridge beams. The issue will be resolved by tracking actual beams through fabrication and installation. The benefit of this research will be an improved understanding of the variation in pre-stressed I-girder camber particularly between the predictions and the measured cambers at erection. This study will build on past research conducted nearly 15 years ago to investigate whether or not the results of the past research efforts are still valid relative to current observations, and will determine whether other findings such as vertical prerelease cracks, etc., may have an impact on the observations.
Project Duration
Tue, 05/11/2010 - 00:00
Tue, 07/31/2012 - 00:00
Tue, 07/31/2012 - 00:00
Yes
{Empty}
Contract Amounts
$100000.00
{Empty}
$100000.00
Yes
TH
No
{Empty}
Homan, Brian
Brian.Homan@state.mn.us
The staff at the U of M, working on the project, was very conscientious of the timelines, and did a great job of keeping to those established timelines, and comments that we had were addressed promptly.
Their work always showed a high level of quality
The cost was in line with the amount of work that was required to complete the project.
Their work was always very detailed and thorough.
Yes
{Empty}
5 - very satisfied