Submission Number: 13389
Submission ID: 63853
Submission UUID: 27a04197-03c8-4a1d-8a0e-927babc3e3d0

Created: Thu, 01/19/2023 - 18:10
Completed: Thu, 01/19/2023 - 18:10
Changed: Thu, 02/09/2023 - 14:50

Remote IP address: (unknown)
Submitted by: admin
Language: English

Is draft: No
Current page: webform_submission_import

Locked: Yes
TRANSPORTATION DEPT
University of Minnesota
3000040994
Monitoring Instrumentation of I-35W Bridge
89261w 131
To synthesize the data to be collected from the I35W Bridge and to provide a written summary of the performance of the bridge on an annual basis. A secondary objective is to evaluate the use of accelerometers and fiber optic sensors for bridge monitoring in the state of Minnesota
Project Duration
Fri, 02/20/2009 - 00:00
Thu, 08/30/2012 - 00:00
Thu, 08/30/2012 - 00:00
Yes
{Empty}
Contract Amounts
$176573.00
{Empty}
$176573.00
No
Trunk Highway
No
{Empty}
Ben Jilk
Ben.jilk@state.mn.us
Always on time.
Very high quality and detail of analysis.
Fair.
They did an outstanding job and provided more work than required by their contract to ensure MnDOT got the information we wanted from this research.
Yes
{Empty}
5 - very satisfied