TRANSPORTATION DEPT
Barr Engineering Company
300029326
I-35W Storm Water Tunnel Rehabilitation
97149
The purpose of this Contract was to 1) develop construction plans and provide construction inspection to rehabilitate 666 feet MnDOT’s I-35W north storm water tunnel, and 2) develop construction plans for future rehabilitation of 4060 feet of the I-35W storm water tunnel from the portal on the south bank of the Mississippi River to the I-35W/I-94 commons area, both in Minneapolis..

A contract was necessary because design of rehabilitation of a mined tunnel with a cast in place lining requires special expertise not available within MnDOT.
Project Duration
Mon, 10/11/2010 - 00:00
Thu, 06/30/2011 - 00:00
Tue, 05/01/2012 - 00:00
Yes
2353
Contract Amounts
$247102.41
{Empty}
$247102.41
Yes
Trunk Highway
No
{Empty}
Bruce Irish
bruce.irish@state.mn.us
On time.
Thoughtful, good quality.
Appropriate.
Very satisfactory.
Yes
{Empty}
5 - very satisfied