TRANSPORTATION DEPT
TKDA
3000009171
Final Design of Bridge 62720
96786
This contract provided final bridge design and plan preparation for Bridge 62720, which was part of the TH 694 reconstruction in Arden Hills. There were eight bridges on this project, and MnDOT designed five in-house, and consultants were hired to design the other three bridges.
Project Duration
Thu, 08/26/2010 - 00:00
Thu, 06/30/2011 - 00:00
Thu, 06/30/2011 - 00:00
Yes
{Empty}
Contract Amounts
$114059.69
$9720.84
$123780.53
Yes
Trunk Highway (Metro consultant budget
No
{Empty}
Paul Stenberg
paul.stenberg@state.mn.us
Contractor delivered plans on time.
Contractor’s plans met contract requirements
Contractor was within budget constraints
Contractors work met expectations for plan quality, turn-in dates and budget.
Yes
{Empty}
5 - very satisfied