TRANSPORTATION DEPT
HNTB Corporation
46708
Value Engineering Study - TH 36 at English Street
{Empty}
MnDOT requires a VE Study to be conducted on projects that are above a TPCE threshold of $20M. These projects meet that cost threshold
Project Duration
Tue, 05/29/2012 - 00:00
Sun, 03/31/2013 - 00:00
Wed, 07/25/2012 - 00:00
Yes
{Empty}
Contract Amounts
$32220.31
{Empty}
$25264.17
Yes
Trunk Highway
No
{Empty}
Anjani Milkert
minnie.milkert@state.mn.us
good
good
very similar to other vendors
It is best to do a VE earlier in the design process; however, this study was conducted on a city project that was well into final design. The study was focused on constructability, maintenance of traffic and staging issues. It was a good learning experience for the city and Terry did a nice job of navigating through the process with the various interests and staff that participated on the team. The team made some good cost savings and project improvement focused recommendations.
Yes
{Empty}
4 - satisfied