Submission Number: 13512
Submission ID: 63976
Submission UUID: 6c8fb9ee-7c3b-469b-9e39-6970ca188fb8

Created: Thu, 01/19/2023 - 18:10
Completed: Thu, 01/19/2023 - 18:10
Changed: Thu, 02/09/2023 - 14:50

Remote IP address: (unknown)
Submitted by: admin
Language: English

Is draft: No
Current page: webform_submission_import

Locked: Yes
TRANSPORTATION DEPT
LHB, Inc.
3000018235
Rating and load posting analysis of State T.H. bri
98355
This Contract provided structural analysis and load rating verification for selected Trunk Highway bridges. This work helped MnDOT adhere to FHWA regulations that require that load rating analysis be performed for all bridges on the Trunk Highway system.
Project Duration
Mon, 04/11/2011 - 00:00
Fri, 12/30/2011 - 00:00
Fri, 12/30/2011 - 00:00
Yes
814.0
Contract Amounts
$99226.39
{Empty}
$99226.39
Yes
Trunk Highway
No
{Empty}
Yihong Gao
yihong.gao@state.mn.us
Satisfied
Satisfied
Satisfied
Satisfied
Yes
{Empty}
4 - satisfied