TRANSPORTATION DEPT
WSB & Associates, Inc.
3000021984
T.H. 212 Design-Build Warranty Monitoring and Insp
97138
The purpose of this Contract was to provide warranty compliance, review of field repairs, and inspection documentation and verification or required warranty repairs for the T.H. 212 Design-Build Project.

A contract was necessary because MnDOT had an inspection personnel shortage due to additional construction project work load created by the American Resource Recovery Act and Chapter 152 funded projects.
Project Duration
Thu, 08/12/2010 - 00:00
Wed, 10/31/2012 - 00:00
Wed, 10/31/2012 - 00:00
Yes
714
Contract Amounts
$64033.74
$29970.36
$94004.10
Yes
TRUNK HIGHWAY
No
{Empty}
Michael Beer
michael.beer@state.mn.us
Contractor performed work in a timely manner. Also made frequent contact to construction contractor when needed to get schedule updates, information and request work be completed in a timely manner.
Quality of work was very good and all work was well document, including pictures as needed. The documentation greatly assisted in the final inspection/acceptance by the FHWA.
Cost was reasonable for work that was required to be intermittent over a multiple years (schedule dictated by the construction contractor’s warranty work in the field).
Overall performance was very good.
Yes
NONE
5 - very satisfied