Submission Number: 13702
Submission ID: 64166
Submission UUID: 9b71b9a8-60c5-4cd7-be55-fed503ee483d

Created: Thu, 01/19/2023 - 18:10
Completed: Thu, 01/19/2023 - 18:10
Changed: Thu, 02/09/2023 - 14:50

Remote IP address: (unknown)
Submitted by: admin
Language: English

Is draft: No
Current page: webform_submission_import

Locked: Yes
TRANSPORTATION DEPT
Braun Intertec Corporation
3000053949
Phase II Investigation; S.P. 8214-114
876
State plans to reconstruct TH 95 from approximately Dubuque Street to Point Road as part of the Stillwater Bridge Project. The project includes construction of a new interchange at TH 36 and TH 95, roadway reconstruction and frontage road construction, a new bridge over the St. Croix River, a pedestrian trail extending to the north of the roadway reconstruction to Chestnut Street and south of the roadway reconstruction area to approximately 8th Avenue (it is within the roadway reconstruction area also), storm water ponds, utilities, etc. The purpose of this contract is to complete a Phase II Investigation of any suspect areas in the project area. The intent of this work is to identify the presence, magnitude and extent of contaminated soil and/or groundwater in the project area. This information will be used by State to determine final project design plans and specifications.
Project Duration
Thu, 04/19/2012 - 00:00
Tue, 04/15/2014 - 00:00
Thu, 12/06/2012 - 00:00
Yes
{Empty}
Contract Amounts
$99918.65
{Empty}
$99918.65
Yes
Trunk Highway
No
{Empty}
Keri Aufdencamp
keri.aufdencamp@state.mn.us
good
good
Acceptable
The Contractor did a good job on this project.
Yes
{Empty}
4 - satisfied