TRANSPORTATION DEPT
Short Elliot Hendrickson, Inc.
3000026871
Limited Phase I Environmental Site Assessment and
98926
The purpose of this contract was to complete a limited Phase I Environmental Site Assessment and Drilling Investigation. The drilling investigation was based on the results of the Phase I that identified areas of potential contamination in the project area. This information was used by MnDOT to determine final project design plans / specifications and to obtain liability protections.
The identification of known and suspected contaminated properties required the use of specialized field equipment that the State does not own, as well as specialized OSHA safety training that most MnDOT employees do not have.
Project Duration
Fri, 05/20/2011 - 00:00
Sat, 06/30/2012 - 00:00
Tue, 06/19/2012 - 00:00
Yes
548
Contract Amounts
$81357.36
{Empty}
$81357.36
Yes
Trunk Highway
No
{Empty}
Keri Aufdencamp
keri.aufdencamp@state.mn.us
Good
Good
Reasonable
Good
Yes
{Empty}
4 - satisfied