TRANSPORTATION DEPT
Alliant Engineering, Inc.
3000083273
Design and Plan for Interchange Lighting; Changeab
1824
Design of and plan generation for interchange lighting systems on TH 60 at the following interchanges: Watonwan CR 12; Watonwan CR 27/TH 4; Watonwan CR 57/TH 4. Included in said design and plan generation is a Changeable Message Sign System at the US 14/169 interchange.
Product or Result of the Contract:
Final plans and specifications for interchange lighting and CMS systems.
Project Duration
Mon, 09/17/2012 - 00:00
Sun, 06/30/2013 - 00:00
Mon, 04/01/2013 - 00:00
Yes
484
Contract Amounts
$43318.30
{Empty}
$43318.30
Yes
Trunk Highway
No
{Empty}
Scott Thompson
Scott.thompson@state.mn.us
Initially, timeliness was poor (missed intermediary deadlines). However the Contractor made up for these initial missteps by providing a high level of customer service and a high-quality product through the latter portions of the contract.
Excellent. Compared to other recent experiences with other contractors, the Contractor provided high-quality deliverables.
Commensurate with duties assigned, and deliverables received.
Excellent
Yes
{Empty}
5 - very satisfied