TRANSPORTATION DEPT
FS Engineering
3000026918
East Grand Forks ADA Improvements
99419
Purpose is to design the ADA Pedestrian Ramp project on TH 2B in East Grand Forks because no MnDOT design staff is available.
Project Duration
Mon, 10/31/2011 - 00:00
Tue, 07/31/2012 - 00:00
Sun, 03/31/2013 - 00:00
Yes
{Empty}
Contract Amounts
$51582.85
$14000
$65582.85
Yes
Trunk Highway
No
{Empty}
Joe McKinnon
joseph.mckinnon@state.mn.us
Contractor had some delays as they looked to add some 100% city sidewalk work. Overall their timeliness was acceptable.
Quality was good.
Cost was acceptable.
Overall performance is good.
Yes
{Empty}
4 - satisfied