TRANSPORTATION DEPT
HZ United, LLC.
3000056542
Pre-Design and Detailed Design of State Projects 5
952
This contract provided products and services needed to bring three State Projects to letting and construction. The products and services included: hydraulics design, detailed design, utility coordination, detailed design road plans, special provisions, and permits. This work was performed by a consultant in response to extra effort needed to deliver Better Roads for Minnesota projects. The projects are Better Roads projects, so beyond typical program work load for the District.
Project Duration
Thu, 05/03/2012 - 00:00
Wed, 05/15/2013 - 00:00
Wed, 05/15/2013 - 00:00
Yes
{Empty}
Contract Amounts
$162261.94
{Empty}
$162261.94
Yes
Trunk Highway, State Road Construction, MnDOT Dist
No
{Empty}
Nathan Pederson
nathan.pederson@state.mn.us
The contractor met all delivery date turn-ins
The quality was of an expected level
The contract came in under the maximum.
The contractor did not have a lot of experience prior to working on this project. The contractor was prompt, easy to work with, and very willing to work together. This project was to deliver three noncomplex surfacing projects. One of the projects did include grading work for a free right. The project manager name was Paul Zager. The contractor switched PM after the initial project manager got laid off.
Yes
{Empty}
4 - satisfied