TRANSPORTATION DEPT
Braun Intertec Corporation
3000082706
Materials Design Recommendation Reports (MDRs) for
1439
This contract provided engineering services resulting in delivery of Materials Design Recommendation Reports for five (5) highway improvement projects; State Projects (S.P.) 3403-68, 4201-41, 4307-41, 8703-24 and 8707-52. The contract was needed because the State staff was not able to perform the work in time to meet scheduled project lettings. Due to delays in filling the MnDOT District's Soils Engineer position, and also the reassignment of staff to perform similar work for extra projects under the Better Roads for Minnesota initiative, State staff was behind schedule, and needed assistance.
Project Duration
Tue, 09/11/2012 - 00:00
Sat, 06/15/2013 - 00:00
Sat, 06/15/2013 - 00:00
Yes
{Empty}
Contract Amounts
$63443.46
{Empty}
$63443.46
Yes
Trunk Highway, MnDOT District 8
No
{Empty}
Ahmed Ahmed
ahmed.ahmed@state.mn.us
Contractor met the agreed baseline schedule
Contractor met project requirement, but required moderate rework.
Proposed estimate for the project cost was $63,443.46 and according last invoice bill the total amount was $51,669.63 about 18.6% less.
Contractor was fair, and reasonable in interactions with the agency, also demonstrated sincere efforts to deliver a quality product.
Yes
{Empty}
4 - satisfied