Submission Number: 13889
Submission ID: 64353
Submission UUID: a5d260e0-8d38-4af3-8979-feb37edb3d19

Created: Thu, 01/19/2023 - 18:10
Completed: Thu, 01/19/2023 - 18:10
Changed: Thu, 02/09/2023 - 14:50

Remote IP address: (unknown)
Submitted by: admin
Language: English

Is draft: No
Current page: webform_submission_import

Locked: Yes
TRANSPORTATION DEPT
University of Minnesota
3000008762/3000027481/
Wakota Bridge Monitoring Program
89261WO145
To monitor instrumentation for bridge 82855 carrying the eastbound lanes of trunk highway 494 over the Mississippi River, as well as the Union Pacific Railroad (milepoint 347.56) and Vererosa Avenue. The instrumentation and monitoring plan is intended to be supplemented by (1) the instruments installed in Piers 2 and 4 of the Wakota Bridge as part of Bridge Health Monitoring and inspection contract. Modification to or validation of the AASHTO LRFD design procedures for determining thermal loads due to seasonal temperature fluctuations can be expected from this research. The users will be MnDOT engineers and bridge designers in Minnesota.
Project Duration
Fri, 06/19/2009 - 00:00
Sun, 07/31/2011 - 00:00
Fri, 05/31/2013 - 00:00
Yes
{Empty}
Contract Amounts
$134990.00
$59000.00
$193990
Yes
Trunk Highway
No
{Empty}
Arielle Ehrlich
arielle.ehrlich@state.mn.us
2
3
4
3
Yes
{Empty}
3 - neutral