TRANSPORTATION DEPT
Short Elliott Hendrickson Inc.
3000076135; 3000053855
Phase I Environmental Site Assessment (TH 36 SP821
1072
MnDOT plans to reconstruct TH 36 from approximately Tuenge Drive to CSAH 23 (Beach Road) as part of the St.
Croix River Crossing Project. The project includes construction of a new interchange at TH 36 and Osgood Avenue,
roadway reconstruction and frontage road construction, a bridge over TH 36 for CSAH 23, potential storm water ponds,
utilities, etc. A frontage road extends past CSAH 23 on the south side ofTH 36 that will tie into Stagecoach Trail. The
purpose of this contract was to complete a Phase I Environmental Site Assessment and assist MnDOT with Regulatory
approvals. The intent of this work was to identify to the extent possible any sources of contamination in the project
corridor that could impact the project.
Project Duration
Thu, 04/19/2012 - 00:00
Tue, 04/15/2014 - 00:00
Sun, 03/31/2013 - 00:00
Yes
{Empty}
Contract Amounts
$65408.54
{Empty}
$65408.54
Yes
Bond
No
{Empty}
Keri Aufdencamp
keri.aufdencamp@state.mn.us
Great
Great
Acceptable
Great
Yes
{Empty}
5 - very satisfied