TRANSPORTATION DEPT
Braun Intertec Corporation
3000080155; 3000063218
Phase I Environmental Site Assessment And Drilling
1206
MnDOT plans to reconstruct an approximate 12-mile corridor ofTH 44 including 1 mile ofTH 44 in Spring Grove. The
proposed TH 44 construction activities are anticipated to include: 12 miles of road resurfacing, four culvert
replacements, and 1-mi le of utility replacement. The purpose of this contract was to complete a Phase I Environmental
Site Assessment and Drilling Investigation based on the results of the Phase I focusing on identified suspect areas. This
information was used by MnDOT to determine final project design plans I specifications and to obtain liability
protections.
Project Duration
Tue, 06/12/2012 - 00:00
Fri, 05/30/2014 - 00:00
Fri, 03/22/2013 - 00:00
Yes
{Empty}
Contract Amounts
$66118.13
{Empty}
$66118.13
Yes
Trunk Highway
No
{Empty}
Keri Aufdencamp
keri.aufdencamp@state.mn.us
Good
Good
Acceptable
Good
Yes
{Empty}
4 - satisfied