TRANSPORTATION DEPT
Stantec Consulting Services Inc.
3000100318
Final Design for Bridge 27891 Re-deck
2677
The Contract provided final bridge design services for the fast-tracked re-deck project funded through the “Map 21” program. The Contract was necessary because in-house Bridge Office staff were unavailable to complete the design within the timeframe required to utilize the “Map 21” funds.
Project Duration
Thu, 12/27/2012 - 00:00
Sun, 06/30/2013 - 00:00
Sun, 06/30/2013 - 00:00
Yes
{Empty}
Contract Amounts
$67337.98
$29638.34
$96976.32
No
TH
No
{Empty}
Paul Stenberg
paul.stenberg@state.mn.us
Contractor met turn-in date for letting.
Contractor’s final plans were satisfactory.
Contractor was within budget.
Contractor plan production was satisfactory and contractor informed MnDOT that certain intended details would not work and was able to adjust plans accordingly.
Yes
{Empty}
5 - very satisfied