TRANSPORTATION DEPT
Hydro-Klean, LLC
3000120922
Video Inspection Project, Fort Snelling & Farmingt
3486
The purpose of this Contract was to provide inspection, location, digital video and cleaning if necessary, of obstructed or
dirty storm sewer system features for TH 5 from the Mississippi River to Davern Street in the City of St. Paul, and for
TH 3 from Willow Street to .1 miles south of junction TH 50 in the City of Farmington.
The result of the Contract will provide updated MAP, digital video, and loading of all new and existing feature
inspection/Global Positioning System (GPS) information into HYDINFRA database. Information on condition of
hydraulic infrastructure will be used by MnDOT for scoping purposes.
Project Duration
Wed, 05/01/2013 - 00:00
Sat, 06/30/2012 - 00:00
Tue, 04/30/2013 - 00:00
Yes
{Empty}
Contract Amounts
$81690.00
{Empty}
$81690.00
Yes
State funds
No
{Empty}
Lee Daleiden
Lee.Daleiden@state.mn.us
Great- they got started on the job right away and finished in a timely fashion.
Above average.
Good -they worked efficiently
Overall I was impressed with how they started and finished the project in a short amount of time and were able to deliver
the final product to me before returning to their office in Iowa. I would suggest the contractor take full advantage of lane
or shoulder closures during any project w/MnDOT to insure that they are safe in the work zone. After cleaning pipes
they should make every attempt to remove the water within the pipe in order to get a clear visual of the bottom of the
pipe.
Yes
{Empty}
5 - very satisfied