TRANSPORTATION DEPT
HDR Engineering Inc.
3000079510
TH 100 Noise and Air Analysis
98845
The purpose of the contact was to provide the necessary noise and air quality analysis for the required environmental documentation. It was necessary to contract these services due to lack of staff availability and timeline necessary to meet the project schedule.
Project Duration
Mon, 08/22/2011 - 00:00
Sat, 06/30/2012 - 00:00
Sun, 06/30/2013 - 00:00
Yes
1272
Contract Amounts
$147491.71
{Empty}
$147491.71
Yes
Trunk Highway
No
{Empty}
Peter Wasko
peter.wasko@state.mn.us
The contractor did a good job meeting timelines and adapting to new ones where changes needed to take place.
The contractor did a very good job with the quality of both the noise and air quality analysis. Only minor errors were found on documents and changes were handled in a quick timeframe. The contractor stayed engaged for the entire process (noise advisory, noise analysis, and public meetings). The contractor developed great graphics for the project!
The contractors cost seemed to fall in line with other projects of this type and worked hard to stay (and under) the budget.
Overall the contractor did a very good job. Timelines were often tight due to changes beyond their control. The deliverables were very good and needed only minor revisions. The handouts that were developed were fantastic and the style was used on our project with great results.
Yes
{Empty}
5 - very satisfied