TRANSPORTATION DEPT
Parsons Brinckerhoff, Inc.
B01051
Construction Design Engineering Support
90665
This Contract was set up to retain the lead designer of the precast segmental bridges on the Crosstown Project to assist MnDOT with responding to construction questions and to provide review of shop drawings for concurrence that construction in accordance with the shop drawings would satisfy the Designer’s (Engineer of Record) intentions.
Project Duration
Mon, 06/04/2007 - 00:00
Fri, 03/30/2012 - 00:00
Fri, 07/31/2009 - 00:00
Yes
{Empty}
Contract Amounts
$75000.00
{Empty}
$75000.00
Yes
Trunk Highway
No
{Empty}
Keith Molnau
Keith.Molnau@state.mn.us
Delivered services on time, no issues.
Delivered services with high quality and excellent cooperation.
Cost of services for responses to RFI during construction was as expected, OK.
Contractor provided timely response and lead segmental designer, Joe Tse, as available “on call” for many questions that came up with MnDOT’s first precast segmental job. Contractor did outstanding job of answering questions and responding to RFI’s as needed.
Yes
{Empty}
5 - very satisfied