Submission Number: 14287
Submission ID: 64751
Submission UUID: 6a993fe0-244f-47bb-be58-cde08331061f

Created: Thu, 01/19/2023 - 18:10
Completed: Thu, 01/19/2023 - 18:10
Changed: Thu, 02/09/2023 - 14:50

Remote IP address: (unknown)
Submitted by: admin
Language: English

Is draft: No
Current page: webform_submission_import

Locked: Yes
TRANSPORTATION DEPT
Braun Intertec Corporation
3000080155; 3000063218
Phase I Environmental Site Assessment And Drilling
1206
MnDOT plans to reconstruct an approximate 12-mile corridor of TH 44 including 1 mile of TH 44 in Spring Grove. The proposed TH 44 construction activities are anticipated to include: 12 miles of road resurfacing, four culvert replacements, and 1-mile of utility replacement. The purpose of this contract was to complete a Phase I Environmental Site Assessment and Drilling Investigation based on the results of the Phase I focusing on identified suspect areas. This information was used by MnDOT to determine final project design plans / specifications and to obtain liability protections.
Project Duration
Tue, 06/12/2012 - 00:00
Fri, 05/30/2014 - 00:00
Fri, 03/22/2013 - 00:00
Yes
{Empty}
Contract Amounts
$66118.13
{Empty}
$66118.13
Yes
Trunk Highway
No
{Empty}
Keri Aufdencamp
keri.aufdencamp@state.mn.us
Good
Good
Acceptable
Good
Yes
{Empty}
4 - satisfied