TRANSPORTATION DEPT
CH2M HILL, Inc.
3000107848
Highway Safety Manual Calibration
2702
The Highway Safety manual (HSM) contains a section on Predictive Methods intended to provide science based analytical procedures for estimating the safety of a roadway and how modifications will influence safety. Models and adjustment factors have been developed which require calibration of the predictive procedures for local conditions. This project will used local conditions (crash data, road geometry information, traffic volume data, etc.) to calibrate the HSM predictive procedures for Minnesota facilities.

This project:
1. Explored the recommended calibration procedures identified in the HSM and quantified the results of application to Minnesota.
2. Explored the appropriate level of calibration for Minnesota specific applications.
3. Produced calibration constants that can be readily used following the release of the HSM.

This contract was necessary to advance safety throughout Minnesota by producing a properly calibrated Highway Safety Manual for use by State and local governments on their roadways. It was reasonable to use a contract for this purpose due to current staff limitations and the need to publish the HSM in a timely manner.
Project Duration
Wed, 02/13/2013 - 00:00
Wed, 07/31/2013 - 00:00
Wed, 07/31/2013 - 00:00
Yes
{Empty}
Contract Amounts
$49999.99
{Empty}
$49999.99
Yes
State
No
{Empty}
Derek Leuer
Derek.leuer@state.mn.us
The contractor moved the project along within the expected timeline
The final outcome of the project was unknown at the beginning of the project. The contractor provided a final deliverable that met expectations.
The contractor delivered the first HSM nodule of calibration at a cost that was as expected.
The contractor learned a new, and largely unknown, process in a quick and timely matter. They did a great job of presenting issues that were coming up, presenting possible solutions, and always accepting what the final decision was.
Yes
{Empty}
4 - satisfied