TRANSPORTATION DEPT
Barr Engineering Company
3000114758
Bridge Instrumentation and Monitoring
3310
This contract is for the instrumentation and monitoring of a geosynthetically reinforced bridge structure, constructed as part of an innovative bridge project (BR 67564) on Rock County highway 55, 3.8 miles east of Luverne, MN, 0.1 miles south of CSAH 4 by a geotechnical consultant with specialty experience in automated monitoring and reporting systems
Project Duration
Fri, 03/22/2013 - 00:00
Sun, 06/30/2013 - 00:00
Sun, 06/30/2013 - 00:00
Yes
{Empty}
Contract Amounts
$84848.77
$9800
$94648.77
Yes
Trunk Highway
No
{Empty}
Derrick Dasenbrock
derrick.dasenbrock@state.mn.us
The contractor was generally very timely with operations. Procurement of components was undertaken in a timely manner. Field installations were established consistent with contract requirements. Some items could have been tested prior to installation potentially saving some field time and complexity.
Overall the quality was high; the contractor worked to solve a number of challenges that came up during the project, usually related to setting up components and dealing with performance and functionality issues. Failed components occasionally required substantial diagnostics and replacement. Some field retrofitting was required.
The contractor’s cost was reasonable given the quality of the work and their commitment to the overall project goals. Extra resources were committed to having systems up and running for a demonstration project held at the site.
Overall, the contractor provided above average work. Several technical challenges were overcome and the provided product met or exceeded expectations in most instances. There were some areas where field set-up, failed components, or complexities with communications systems and cellular modems provided for unexpected challenges and the need for diagnostic and repair time; the consultant worked to resolve problems quickly and efficiently and did provide a functional system as required by the contract, eventually overcoming these obstacles.
Yes
{Empty}
5 - very satisfied