TRANSPORTATION DEPT
Brain Intertec Corporation
3000075928
Metro 2012 Design Build Verification
473
Contractor worked as Design Build Verification Consultant (DBVC) for two Design Build projects: SP 6280-353 )I- 35E Maryland Bridge), and SP 2722-81 on TH 55.

A contract was necessary because of a personnel shortage due to additional project work load created by federal funding that advanced the Maryland project.
Project Duration
Tue, 04/03/2012 - 00:00
Sat, 11/30/2013 - 00:00
Fri, 09/06/2013 - 00:00
Yes
{Empty}
Contract Amounts
$159187.94
{Empty}
$159187.94
Yes
Chapter 152 Bonds and Better Roads Funds
No
{Empty}
Jerome Adams
jerome.adams@statemn.us
The Contractor did everything on schedule.
The Contractor’s work was of good quality.
The Contractor completed the project under budget.
Braun did a good job. These projects were not that expensive and not that difficult. Therefore, there weren’t any heroic stories to tell explaining that Braun really had to go above and beyond to complete something. I am satisfied with their work and I would hire them again.
Yes
{Empty}
4 - satisfied