TRANSPORTATION DEPT
MN Department of Natural Resources (MnDNR)
3000077616
Tettegouche State Park Visitor Center
99020
PS&E for construction of Tettegouche State Park Visitor Center and Safety Rest Area to replace existing facility that no longer served the functional and operational needs of the site. This contract was required for MnDOT and MnDNR to share cost of design consultant Miller Dunwiddie Architects (MDA) to provide bid documents for construction.
Project Duration
Mon, 08/29/2011 - 00:00
Mon, 06/30/2014 - 00:00
Sun, 06/30/2013 - 00:00
Yes
{Empty}
Contract Amounts
$172307.50
$6085.00
$178392.50
Yes
Federal (FHWA Coordinated Border Infrastructure fu
No
{Empty}
Vera Westrum Ostrom
Vera.Westrum-Ostrom@state.mn.us
DNR directed MDA to meet original Dept. of Admin project let on schedule. See “Evaluate the Contractor’s Quality” section for information on project rebid.
MDA hired sub-consultant for cost estimation, who inaccurately prepared estimate for metro location, not taking into account site location of North Shore. Original bids came in over budget, which necessitated value-engineering of the project for re-bid.
Not Applicable
DNR provided adequate direction to consultant architect MDA to provide PS&E for bid documents for new construction.
Yes
{Empty}
4 - satisfied