Submission Number: 14728
Submission ID: 65192
Submission UUID: 26e59535-e7c6-4992-8440-496598537b18

Created: Thu, 01/19/2023 - 18:10
Completed: Thu, 01/19/2023 - 18:10
Changed: Thu, 02/09/2023 - 14:52

Remote IP address: (unknown)
Submitted by: admin
Language: English

Is draft: No
Current page: webform_submission_import

Locked: Yes
TRANSPORTATION DEPT
Parsons Brinckerhoff, Inc.
3000080595 / 3000056484
Bridge ratings and load posting analysis for Trunk
772
The Federal Highway Administration has mandated that every bridge on the State's Trunk Highway system be
analyzed to verify the design and load rating capacity. The State's bridge ratings staff will be performing this analysis
on other bridges, but in order to complete the project in a timely manner, some of the analysis needs to be obtained
through professional technical contracts.
Project Duration
Tue, 05/01/2012 - 00:00
Fri, 06/14/2013 - 00:00
Fri, 06/14/2013 - 00:00
Yes
{Empty}
Contract Amounts
$99952.48
{Empty}
$99952.48
Yes
Trunk Highway
No
{Empty}
Yihong Gao
yihong.gao@state.mn.us
Satisfied
Satisfied
Satisfied
Satisfied
Yes
{Empty}
4 - satisfied