Submission Number: 14474
Submission ID: 64938
Submission UUID: 0ab21d98-2d27-49c7-9f8e-55cfc6647ad5

Created: Thu, 01/19/2023 - 18:10
Completed: Thu, 01/19/2023 - 18:10
Changed: Thu, 02/09/2023 - 14:52

Remote IP address: (unknown)
Submitted by: admin
Language: English

Is draft: No
Current page: webform_submission_import

Locked: Yes
TRANSPORTATION DEPT
Short Elliott Hendrickson, Inc.
3000097033, 3000142351
Assessment of Interconnected Highway Rail Grade Cr
2276
Burlington Northern Santa Fe (BNSF) Railroad conducted field assessments of interconnected highway-grade crossings that have MnDOT traffic signals and made recommendations for improvements. The purpose of this project was to complete the following:
• Determine which recommendations comply with the December 2011 MnMUTCD and existing MnDOT signal design specifications.
• Determine the cost associated with each recommended change.
• Create a final report outlining each BNSF recommendation and MnDOT’s response including rationale and timeline for completion.

The outcomes of this Contract are:
• Final Report with rationale for complying or not complying with recommendations including timeline for implementation.
• Updated traffic signal preemption worksheet for each intersection.

This Contract was necessary in order to complete the assessment in a timely manner to determine if safety specifications were being met on at grade crossings and mitigate potential legal claims for noncompliance.
Project Duration
Thu, 12/06/2012 - 00:00
Wed, 07/31/2013 - 00:00
Wed, 07/31/2013 - 00:00
Yes
{Empty}
Contract Amounts
$77985.37
{Empty}
$77985.37
Yes
State
No
{Empty}
Jerry Kotzenmacher
Jerry.kotzenmacher@state.mn.us
Project was very rushed at the end.
Quality was acceptable but nothing more.
Contractor did not use all funds for this project.
Contractor provided minimum needs to this project.
Yes
{Empty}
3 - neutral