Specifically, we had few issues with the subconsultant (who seemed to do most of the work), but the lack of HRGreen electrical and civil engineering effort on the project, which was evident just before bidding caused quality issues and delay. The subsequent site investigation, civil input, and electrical drawings -which all should have been known to be part of the contract - was cause for the project being late to issue and bid.
Same as above, but exasperated by the fact that HRGreen kept giving us new project managers throughout the project (three during the project, and a new one now for 4 different PMs) The lack of knowledge/continuity on the project was frustrating to not only myself, but to PMD. There were over $34,000 in contractor added electrical costs to cover elements of the project requested in design, but left out of the documents.
None of the HRGreen PMs seemed to read the contract, and I was, and still am, dealing with issues to close this project out.