TRANSPORTATION DEPT
Kimley-Horn and Associates, Inc.
54977
Preliminary design for a managed lane
1082
MnDOT needed a consultant to provide project management, air quality analysis, noise analysis and abatement design for a potential managed lane on TH 77 from 140th Street in Apple Valley to Old Shakopee Road in Bloomington.
MnDOT needed specialized expertise to develop a layout using a movable barrier system.
Project Duration
Tue, 11/06/2012 - 00:00
Wed, 04/30/2014 - 00:00
Wed, 04/30/2014 - 00:00
Yes
{Empty}
Contract Amounts
$459839.88
$59277.18
$519117.06
Yes
TH
No
{Empty}
Jon Solberg
jon.solberg@state.mn.us
Contractor met every deadline that was set.
The Contractor’s dedication to quality was exceptional
The Total cost was under budget.
The Contractor’s performance was excellent, they provided quality work, on time and under budget.
Yes
{Empty}
5 - very satisfied