Submission Number: 15086
Submission ID: 65550
Submission UUID: e051b683-5cc8-44fd-aa0d-ee7e13ad65ae

Created: Thu, 01/19/2023 - 18:10
Completed: Thu, 01/19/2023 - 18:10
Changed: Thu, 02/09/2023 - 14:52

Remote IP address: (unknown)
Submitted by: admin
Language: English

Is draft: No
Current page: webform_submission_import

Locked: Yes
TRANSPORTATION DEPT
Bolton & Menk, Inc. Consulting Engineers & Surveyo
61452
HCM Unsignalized Crosswalk LOS Training
3619
Complete a data analysis, develop a training manual and Guidebook, and develop a training program for the application of the unsignalized pedestrian crossing methodology in the 2010 Highway Capacity Manual
Project Duration
Fri, 04/26/2013 - 00:00
Fri, 01/31/2014 - 00:00
Fri, 04/25/2014 - 00:00
Yes
{Empty}
Contract Amounts
$29252.08
$15413.52
$44665.60
Yes
LRRB
No
{Empty}
Bartelt, Mitchell
Mitch.Bartelt@state.mn.us
Outstanding. They were done on time, and with little prompting from MnDOT personnel.
They did a good job. They synthesized numerous manuals and documents into one, and then provided training on it.
It was reasonable.
Overall, they did a good job. They were particularly good about being self-sufficient and doing tasks on schedule.
Yes
NONE
4 - satisfied