TRANSPORTATION DEPT
Alliant Engineering, Inc.
73647
Metro Wide Signal Optimization
5229
Signal Optimization at 46 intersections in the Metro Area
Project Duration
Fri, 01/24/2014 - 00:00
Mon, 06/30/2014 - 00:00
Mon, 06/30/2014 - 00:00
Yes
{Empty}
Contract Amounts
$98307.21
$0
$98307.21
Yes
TH
No
{Empty}
Nicole Flint
Nicole.Flint@state.mn.us
The consultant followed the project schedule and delivered a quality product within the deadline
The consultant delivered high-quality coordination timing plans for all corridors that had excellent two-way progression with the lowest possible delay for the cross street.
The cost per signal was very competitive with 46 signals.
This consultant has a lot of skill and experience in developing signal optimization timing plans and that was shown in the results of this project which will save the public $4.5 million/year in user benefits.
Yes
NONE
5 - very satisfied