TRANSPORTATION DEPT
Thompson Engineering Company
56731
Comparison of Material Distribution Systems for Wi
1531
The goal of this project is to identify as many solid material distribution systems as possible and develop a plan for field testing them. Systems with pre-wetting capabilities should be included in the study, although equipment for slurries or directly liquid applications is not included in the scope of this project. Phase I will focus on identifying and cataloging these systems, as well as developing a testing plan. Phase II would conduct field testing, identify the most effective systems and develop a recommended specification for a material distribution system.
Project Duration
Fri, 12/28/2012 - 00:00
Fri, 01/31/2014 - 00:00
Mon, 06/30/2014 - 00:00
Yes
{Empty}
Contract Amounts
$44960.00
$0
$44960.00
Yes
TH
No
{Empty}
Tom Peters
Tom.peters@state.mn.us
The deliverables completed were generally on time.
Overall quality was good.
Cost appears to be in line for the required services that were being delivered.
Satisfactory
Yes
NONE
4 - satisfied