Transportation Department
WSB & Associates, Inc
200716
TH 24 Corridor and Traffic Modeling and Geometric Layouts Options
1035066W05
MnDOT needed to develop a predesign matrix to determine how to manage traffic and safety concerns in a high traffic area.
With a bridge needing to be replaced, the rest of the corridor needed to be modeled to determine how to optimize this and
future improvements. In the time of the contract this bridge was identified as an IIJA bridge to replace and this project allowed
it to be properly designed with this information. This was not able to be accomplished in this timeline within MnDOT.
Project Duration
Tue, 09/21/2021 - 00:00
Thu, 06/30/2022 - 00:00
Thu, 12/15/2022 - 00:00
Yes
{Empty}
Contract Amounts
$471463.86
$41488.71
$512952.57
Yes
state funds
No
{Empty}
Nixon,Thomas
Thomas.Nixon@state.mn.us
We had to extend our contract end date, but the right outcomes were arrived at.
WSB and Andy has a lot of resources and knowledge that made this challenging project possible to develop.
WSB was fair in their cost of service.
good
Yes
{Empty}
4 - satisfied