Submission Number: 25552
Submission ID: 78871
Submission UUID: 0a278b8c-8310-4c41-af9d-569138d4809c

Created: Tue, 07/25/2023 - 19:59
Completed: Tue, 07/25/2023 - 19:59
Changed: Fri, 08/11/2023 - 19:42

Remote IP address: (unknown)
Submitted by: Calleigh.Hoffenkamp
Language: English

Is draft: No

Locked: Yes
Pollution Control Agency
BRAUN INTERTEC
217559
SW-25_groundwater delineation_FY23
{Empty}
Braun Intertec will perform a subsurface investigation at the Winona County Closed Landfill to delineate the extent of groundwater contamination. This project is a continuation of the previous FY22 investigation. Braun will prepare drilling specifications and will subcontract the drilling to a state contractor. Braun will oversee drilling activities. Drilling activities will include borehole logging and the installation of three groundwater monitoring wells. Braun will prepare a report summarizing methods and results. Braun will perform all services and/or construction as per the purchasing manual.
Project Duration
Fri, 08/19/2022 - 00:00
Fri, 06/30/2023 - 00:00
Fri, 06/30/2023 - 00:00
Yes
{Empty}
Contract Amounts
$183411.13
$6806.49
$190217.62
No
STATE
No
{Empty}
DANIEL HEGRENES
Daniel.Hegrenes@state.mn.us
Very satisfied
Very satisfied
Very satisfied
Very satisfied
No
{Empty}
5 - very satisfied