Transportation Department
Collins Engineers, Inc
226368
FY23 Enhanced Pier Caps
1052849
Metro District inspects approximately 750+ bridges annually, and does not have the staffing available to perform enhanced, arms reach inspections in addition to the federally mandated routine safety inspections. Therefore, it was deemed necessary to engage the services of a consultant to augment our capabilities.
Project Duration
Tue, 03/28/2023 - 00:00
Fri, 06/30/2023 - 00:00
Fri, 06/30/2023 - 00:00
Yes
{Empty}
Contract Amounts
$99808.39
$74860.49
$174668.88
Yes
STATE FUNDS
No
{Empty}
Arseneau,Michael Bernard
Michael.Arseneau@state.mn.us
Work was completed within the required time frame; however a significant amount of the final reports were not entered and submitted into SIMS for final review until nearly the end of the contract time frame. All field work and inspection drawings were completed in a reasonable time.
All pier cap defect drawings and were very detailed and high-resolution, providing the information we need.
The total cost of the project came in slightly higher than the original budgeted amount, but it was within reason for the amount of work completed and the required manpower.
GOOD
Yes
{Empty}
4 - satisfied