Submission Number: 25935
Submission ID: 80806
Submission UUID: 30d4b346-7f8f-4b90-8afb-9e3e5735a736

Created: Thu, 10/12/2023 - 20:07
Completed: Thu, 10/12/2023 - 20:07
Changed: Mon, 10/30/2023 - 20:31

Remote IP address: (unknown)
Submitted by: patricia.johnson
Language: English

Is draft: No

Locked: Yes
Pollution Control Agency
West Central Environmental Consultants
215121
3M GAC Installation Oversight East Metro Area FY23
{Empty}
WCEC oversaw GAC installation at 62 residences with MDH issued advisories and an additional 87 residences that have not been issued advisories but have a health advisory (HI) between 0.5 and 1.0. This work included scheduling and tracking of GAC installations in the East Metro area, along with the tracking of periodic GAC maintenance and repair in a WCEC maintained database. Database updates summarizing progress were provided bimonthly. No one in the agency is currently doing this work, so a contractor was needed.
Project Duration
Mon, 07/11/2022 - 00:00
Fri, 06/30/2023 - 00:00
Thu, 03/30/2023 - 00:00
Yes
{Empty}
Contract Amounts
$49883.85
{Empty}
$49883.85
Yes
state
No
{Empty}
Megan Holthaus
megan.holthaus@state.mn.us
Very satisfied
Very satisfied
Very satisfied
Very satisfied
Yes
Comments:
My experience with WCEC on this work order was positive. They did well in communicating with other state contractors on scheduling GAC installations and maintaining the database with each residence’s install status.
5 - very satisfied