Submission Number: 26268
Submission ID: 89671
Submission UUID: bf25862e-5abe-43c1-b8b1-8929913bb8d2

Created: Mon, 02/26/2024 - 21:24
Completed: Mon, 02/26/2024 - 21:24
Changed: Wed, 02/28/2024 - 15:16

Remote IP address: (unknown)
Submitted by: dalia.jorge
Language: English

Is draft: No

Locked: Yes
Transportation Department
Alliant Engineering, Incorporated
235656
2024 District 7 Mankato Saint Peter Waseca Signal Optimization
1054659
The purpose was to install signal coordination in multiple locations throughout D7. D7 does not have the staff to collect new
counts, model existing conditions, create new models, devise new timing, and install and verify new timing.
Project Duration
Fri, 09/08/2023 - 00:00
Fri, 08/30/2024 - 00:00
Sun, 12/31/2023 - 00:00
Yes
{Empty}
Contract Amounts
$79609.35
{Empty}
$79609.35
Yes
{Empty}
No
{Empty}
Fahrendorf,John Lester
John.Fahrendorf@state.mn.us
Alliant completed the project in a timely manner despite a later than expected NTP
Final product was a success but attention to detail in scope requirements needed some attention
Cost came in within budget.
good
Yes
{Empty}
5 - very satisfied