Administration Dept
ERICKSEN ELLISON & ASSOC INC
210967
MCF-FARIBAULT DAKOTA
78FA0080
Full architectural/engineering/technical design services, to include construction administration, for the following: - Demolition of a 3,249+/- GSF two story brick building, to include a new utility tunnel in the basement to preserve existing utilities. - Construction of a new 4,383+/- GSF building addition - Renovation of the existing 19,438+/- GSF Dakota Building, to including, but not limited to, interior finishes, window replacement, new roof, tuckpointing, misc. repair. Also included is work in the basement to eliminate wet conditions/mold/etc. Asphalt replacement is also included at the entry drive and staff parking.
Project on hold
Project Duration
Wed, 04/20/2022 - 00:00
Fri, 04/19/2024 - 00:00
Fri, 04/19/2024 - 00:00
Yes
{Empty}
Contract Amounts
$799983
$7600
$807503
No
{Empty}
No
{Empty}
{Empty}
{Empty}
Good
Good
Good
Good
Yes
{Empty}
5 - very satisfied